How long is the "acceptance period" of environmental protection facilities? These matters about environmental acceptance must be clear

来源:环保365 阅读量:16223 2019-12-28 09:26:15 Source: Environmental Protection 365 Views: 16223

Guide: How long is the "acceptance period" of environmental protection facilities? These matters regarding environmental protection acceptance should be clear, that is, the acceptance deadline, the main body responsible for the acceptance, the acceptance commissioning and monitoring, the reference requirements for the filing of the acceptance data, and the key content of the site inspection.
Acceptance period
The acceptance period refers to the period from the date when the environmental protection facilities of the construction project are completed to the date when the construction unit makes the acceptance report public.
Except for water and air pollution prevention facilities that need to obtain pollution discharge permits, the acceptance period of other environmental protection facilities generally does not exceed 3 months; if such environmental protection facilities need to be debugged or rectified, the acceptance period may be appropriately extended, but most Not longer than 12 months.
Clarify the subject of acceptance
After the completion of the construction project preparing the environmental impact report (table), the construction unit shall organize inspection, monitoring, recording the construction and commissioning of the environmental protection facilities of the construction project, and prepare an acceptance report. If the construction unit does not have the ability to prepare the acceptance report, it may entrust a competent technical institution to prepare it. The construction unit is responsible for the commissioning of the acceptance report by the technical institution entrusted, and can clarify the obligation of the commissioned technical institution to prepare the acceptance report through the contract and supervise its performance in accordance with the contract.
Before the amendments to the Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Wastes and the Law on the Prevention and Control of Environmental Noise Pollution of the People ’s Republic of China are completed, the environmental protection department shall check and accept the construction project noise or solid waste pollution prevention facilities according to law, and the supporting construction of the main project The prevention and control facilities for noise or solid waste pollution shall be carried out simultaneously with the environmental protection acceptance of the main project.
Acceptance, commissioning and monitoring
It shall be prepared in accordance with the requirements of the technical specifications for environmental protection acceptance of the construction project (attachment), the environmental impact report (table) of the construction project, and the EIA approval documents.
The main content should include:
Foreword, acceptance monitoring basis
Construction Project Engineering Overview
Main pollution sources and treatment measures
Main EIA conclusions and requirements for EIA approval
Acceptance evaluation criteria
Quality assurance measures and monitoring analysis methods
Acceptance monitoring results and analysis
Environmental Management Inspection
Public opinion survey
Conclusions and recommendations
If the environmental protection facilities are not completed at the same time as the main project, a pollution discharge permit shall be obtained, and the construction project shall not be commissioned. During commissioning, the construction unit shall monitor the operation of environmental protection facilities and the impact of the construction project on the environment. Acceptance monitoring should be carried out under the condition that the commissioning conditions of the main project are stable and the environmental protection facilities are operating normally, and the actual operating conditions during monitoring are truthfully recorded. Where national and local standards for pollutant discharge or industrial inspection and technical specifications provide otherwise for working conditions and production loads, such provisions shall be implemented. The environmental monitoring activities carried out during the acceptance are carried out with reference to the relevant management regulations of the enterprise's own monitoring, and other competent monitoring institutions can also be entrusted to carry out the monitoring and be responsible for their monitoring data and conclusions.
About the Acceptance Working Group
After the preparation of the acceptance report, the construction unit may organize the establishment of an acceptance working group. The acceptance working group may be composed of representatives of construction units, design units , construction units, environmental impact report (table) preparation agencies, acceptance report preparation agencies, monitoring units and other professional technical experts. Relevant professional and technical experts can be selected from the environmental protection expert database established by environmental protection departments at all levels, and the scope and number of representatives can be determined by themselves.
The inspection and acceptance working group shall strictly inspect the environmental protection facilities supporting the construction project and form acceptance opinions in strict accordance with relevant national laws and regulations, technical specifications for environmental protection acceptance of completed construction projects, environmental impact report (table) of construction projects, and environmental impact assessment approval documents. .
Comments on acceptance
Acceptance opinions include
Basic situation of engineering construction
Engineering changes
Implementation of environmental protection facilities
Commissioning effect of environmental protection facilities
Environmental Impact of Engineering Construction
Acceptance conclusions and follow-up requirements, etc.
The acceptance conclusion shall make clear whether the environmental protection facilities of the construction project are qualified for acceptance.
Acceptance opinions (each page) must be signed and confirmed by members of the acceptance team.
Information Disclosure
The construction unit shall, within 5 working days after issuing a qualified acceptance opinion, make the acceptance report and acceptance opinion available to the public through the website or other means convenient for the public to understand, and the period of publicity shall not be less than 20 working days. Within 5 working days after the expiry of the acceptance report and acceptance opinions, the construction unit must log in to the "National Environmental Protection Acceptance Information Platform for Completed Construction Projects" to fill in basic information about the construction project, environmental protection facilities acceptance and other relevant information. Make the above information public.
Acceptance data filing requirements reference
Acceptance report of environmental protection facilities for construction projects.
The implementation of the "three simultaneous" environmental protection measures for construction projects.
Description of the standard setting of sewage outlets and on-site photos of the "sewage outlet signboard".
Color photographs of the project's main engineering and environmental protection facilities.
If hazardous wastes need to be entrusted to a qualified unit for disposal, a copy of the agreement signed by both parties and the qualifications of the receiving unit shall be provided. A copy of the hazardous waste transfer co-bill shall be provided if hazardous waste is transferred.
If the comments on the EIA documents require the preparation of an environmental risk emergency plan, provide an environmental risk emergency plan and a local environmental protection department record confirmation document.
Where the EIA documents require comments to install online monitoring instruments, an online monitoring instrument comparison monitoring report and online certification between the online monitoring instrument and the local environmental protection department shall be provided.
Completion related drawings (including photos or drawings of main works and pollution treatment facilities).
Acceptance documents issued by environmental protection departments for noise and solid waste pollution prevention facilities.
Other supporting materials (such as shutdown certificate, etc.).
Highlights of on-site inspections
After the environmental impact report (table) has been approved, has the nature, scale, location, production technology adopted, or measures to prevent pollution and prevent ecological damage of the construction project changed significantly?
Whether the pollutant discharge meets the relevant national and local standards, the environmental impact report (table) and the EIA approval document, or the control requirements of the total pollutant index;
Whether there is any problem that the major environmental pollution has not been completed during the construction process, or the major ecological damage has not been restored;
Whether the construction projects included in the sewage permit management have unlicensed sewage or non-certified sewage;
Whether the ability of environmental protection facilities constructed in stages, put into production or used in stages to prevent environmental pollution and ecological damage meets their corresponding main engineering needs;
Whether the basic information and data of the acceptance report are true and credible, whether there are major missing items or omissions in the content, and whether the acceptance conclusion is clear and reasonable;
Relevant local governments or departments are committed to implementing environmental protection measures such as relocation, functional replacement, and habitat protection within the protective distances supporting the project construction;
Whether supporting the construction of online monitoring facilities is completed in accordance with specifications;
Whether the relevant environmental protection laws, regulations, and other provisions do not pass the environmental protection acceptance.
Circumstances in which construction unit may not submit qualified opinions for acceptance
Failure to complete the environmental protection facilities as required by the environmental impact report (table) and its approval decision, or the environmental protection facilities cannot be put into production or use at the same time as the main project;
Pollutant emissions that do not meet the relevant national and local standards, the environmental impact report (table) and its approval decision or the requirements of the total pollutant emission control indicators;
After the environmental impact report (table) was approved, the nature, scale and location of the construction project, the production technology adopted or the measures to prevent pollution and prevent ecological damage have undergone major changes. The construction unit has not re-approved the environmental impact report (table) Or the environmental impact report (table) has not been approved;
The major environmental pollution caused by the construction process has not been completed, or the major ecological damage has not been restored;
Construction projects that are included in the management of sewage discharge permits, discharge sewage without a license or discharge sewage without a license;
The construction projects that are constructed in stages, put into production in stages, or used in stages that should be inspected and accepted in accordance with the law, whose ability to prevent and control environmental pollution and ecological damage by the staged construction, staged production or use of environmental protection facilities cannot meet their corresponding main engineering needs;
The construction unit was punished for violating national and local environmental protection laws and regulations for the construction project, and was ordered to make corrections, which have not been completed;
The basic information and data of the acceptance report are obviously untrue, there are major missing items or omissions in the content, or the acceptance conclusion is unclear or unreasonable;
Those who need to build online monitoring facilities and fail to complete related work in accordance with regulations.
Other environmental protection laws, regulations, and other provisions may not pass environmental protection acceptance.
About "Before You Invest"
Environmental protection facilities that need to be built for construction projects are not completed, have not been accepted or are not qualified for experience, and construction projects have been put into production or use, have been falsified in the acceptance of environmental protection facilities, or the construction unit has not disclosed environmental protection facilities to the public according to law The acceptance report shall be punished in accordance with the "Regulations on Environmental Protection Management of Construction Projects".
According to the regulations, if the environmental protection facilities that need to be built are not completed, have not been accepted or failed in acceptance, and the construction project is put into production or use, or fraudulent in the acceptance of environmental protection facilities, the environmental protection administrative department at or above the county level shall order the deadline. For corrections, a fine of 200,000 to 1 million yuan shall be imposed; for those failing to make corrections within a time limit, a fine of 1 to 2 million yuan shall be imposed; to those directly responsible and other responsible persons, 50,000 to 200,000 yuan Fines; those that cause major environmental pollution or ecological damage shall be ordered to stop production or use, or be reported to the people's government with the right of approval for approval and ordered to close. If the construction unit fails to disclose the acceptance report of environmental protection facilities to the public according to law, the environmental protection administrative department at or above the county level shall order it to be made public, impose a fine of 50,000 yuan to 200,000 yuan, and make an announcement.
Original title: How long is the "acceptance period" of environmental protection facilities? These matters about environmental acceptance must be clear

I want to comment

Civilize the Internet and speak rationally. (You can also enter 200 characters)
expression

All comments represent the opinions of netizens and have nothing to do with this stand.

related 3d之家

Construction waste resource utilization rate is only 5%. Changchun management measures focus on seven aspects 2020-01-13 13:07:18
As the city continues to move forward, more and more construction waste is coming, and Changchun is no exception. Recently, Changchun issued the "Measures for the Management of Urban Construction Waste in Changchun", which includes seven chapters and a total of 55 articles, which set specific requirements for the source reduction of construction waste, the utilization of resources, and the planning and construction of disposal sites. , And clarified the corresponding punishment methods.
Ten key optimization measures for Zhejiang's eco-environmental supervision and service are determined2019-12-27 10:29:16
A few days ago, Zhejiang issued a number of measures on further optimizing the ecological environment supervision services to promote high-quality economic development, including optimizing the ecological environment regional management and control, deepening the environmental review and approval reform, implementing the "one-certificate" management of pollutant discharge permits, and implementing the "one-certificate" pollutant discharge permits. Ten contents including management and improvement of the ecological environment law enforcement assistance mechanism.
Anhui: Second Solicitation of Opinions on Air Pollutant Emission Standards for the Cement Industry2019-12-21 08:57:34
A few days ago, Anhui released the “Annual Provincial Cement Industry Air Pollutant Emission Standards (Second Consultation Draft)”, which specifies the air pollutant emission concentration limits, monitoring and supervision and management requirements for cement industry enterprises in areas under the jurisdiction of Anhui Province. From January 1, 2021, enterprises will implement the maximum allowable concentration of air pollutants specified in the standards.

Copyright and Disclaimer: All works marked "Source: Environmental Protection Online" on this website are works by Zhejiang Xingwang Baomingtong Network Co., Ltd.-Environment Protection Online legally owns the copyright or the right to use, and may not be reproduced without the authorization of this website , Extract or use the above works in other ways. Those who have already authorized the use of works on this website shall use them within the scope of authorization and indicate "Source: Environmental Protection Online". Anyone who violates the above statement will be held responsible for related legal responsibilities.

This website reprints and notes works from other sources (non-environmental protection online) for the purpose of transmitting more information, does not mean that this website agrees with its views or is responsible for its authenticity, and does not assume direct responsibility for such works infringement And joint liability. When other media, websites or individuals reprint from this website, they must retain the first source of the works indicated on this website and bear their own legal responsibilities such as copyright.

If you are involved in the content of the work, copyright, etc., please contact this website within one week from the date of publication of the work, otherwise it is deemed to waive the relevant rights.

Don't want to miss industry 3d之家?

Download Environmental Online App

One-click filtering to subscribe

More informative

环保新闻网热门广告位招租中 资讯页热门广告位招租——列表页右侧1

更多 Illustration says more environmentally friendly


About Us | Site Services | Member Services | Enterprise Websites | Owned Websites | Friendly Links | Browse Product Categories | Product Sitemap | Channel

Environmental Protection Online-"Internet +" Service Platform for Environmental Protection Industry

Copyright 2020gatisrael.com All Rights Reserved Legal Adviser: Lawyer Jia Ximing of Zhejiang Tianlu Law Firm

Customer Service Hotline: 0571-87209775 Purchase Hotline: 0571-87759925 Media cooperation: 0571-87759680

Customer Service Department: Purchasing Department: Editorial Department: Exhibition cooperation: Market Group: Market Group II:

shut down
$ VoteIsLock